Posts

If a post is assigned as check point, SEAM will inform you of the number of pieces which has been through that particular post every hour, and for each of your orders containing that post. This can be very useful for monitoring urgent orders. Posts can be:

  1. Production Unit entry
  2. Section Entry
  3. Checkpoint 1 (User defined, the label for this is described in Sites)
  4. Checkpoint 2 (User defined, the label for this is described in Sites)
  5. Section Exit
  6. Production Unit exit